SME Times is powered by   
Search News
Just in:   • India, Venezuela discuss deeper energy ties amid crude supply concerns  • BHEL shares jump over 2 pc on bagging Rs 21,000 crore power project order  • RBI’s repo rate decision reflects wait-and-watch approach to assess evolving global situation  • India clocks robust 7.7 pc GDP growth in 2025-26, Q4 growth at 7.8 pc  • RBI keeps repo rate unchanged at 5.25 pc, maintains ‘Neutral’ stance 
Last updated: 13 May, 2026  

railway.jpg Cabinet approves Rs 20,667 crore double line railway project in Gujarat

railway.jpg
   Top Stories
» India clocks robust 7.7 pc GDP growth in 2025-26, Q4 growth at 7.8 pc
» RBI keeps repo rate unchanged at 5.25 pc, maintains ‘Neutral’ stance
» Crude oil prices fall over 1 pc as ceasefire hopes ease West Asia concerns
» Forced labour import curbs: US proposes up to 12.5 pc tariff on 60 countries, including India
» GST collections clock nearly Rs 2 lakh crore in May after robust April
IANS | 13 May, 2026

The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on Wednesday approved the Ahmedabad (Sarkhej)-Dholera semi-high-speed double line railway project - the first of the Indian Railways planned with indigenously developed technology, with a total investment of Rs 20,667 crore. 

The project section will provide faster connectivity between Ahmedabad, Dholera SIR, the upcoming Dholera Airport and the Lothal National Maritime Heritage Complex (NHMC), a Cabinet statement said.

Connecting Ahmedabad with Dholera will cut down passenger travel time, enabling comfortable daily commuting and same‑day return trips. This semi-high-speed railway will not only bring the two cities closer but also benefit people living hundreds of kilometres away. It will serve as a pioneer project, acting as a reference model for the phased expansion of semi-high-speed rail across the country, it added.

The project covering the Ahmedabad district in Gujarat will increase the existing network of Indian Railways by about 134 km. The proposed projects will enhance connectivity to around 284 villages, with a population of about 5 lakh.

The new line proposal will provide direct connectivity and improve mobility, providing enhanced efficiency and service reliability for Indian Railways. The project is in line with Prime Minister Modi’s vision of a New India, which will make people of the region "atmanirbhar' by way of comprehensive development in the area, which will enhance their employment opportunities, the statement said.

The project is planned in accordance with the PM-Gati Shakti National Master Plan, with a focus on enhancing multi-modal connectivity and logistics efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for the movement of people, goods, and services, the statement said.

The Railways, being an environment-friendly and energy-efficient mode of transportation, will help both in achieving climate goals and minimising logistics cost of the country, reduce oil import (0.48 crore Litres) and lower CO2 emissions (2 Crore kg), which is equivalent to the plantation of 10 lakh trees, the statement added.

 
Print the Page
Add to Favorite
 
Share this on :
 

Please comment on this story:
 
Subject :
Message:
(Maximum 1500 characters)  Characters left 1500
Your name:
 

 
  Customs Exchange Rates
Currency Import Export
US Dollar
₹94.2
₹92.5
UK Pound
₹128.85
₹124.8
Euro
₹112.2
₹108.45
Japanese Yen ₹59.85 ₹58
As on 06 May, 2026
  Daily Poll
What is the biggest war impact on MSMEs?
 Export Disruption
 Raw Material Spike
 Freight Cost Surge
 Payment Delays
 Currency Volatility
 All
  Commented Stories
 
 
About Us  |   Advertise with Us  
  Useful Links  |   Terms and Conditions  |   Disclaimer  |   Contact Us  
Follow Us : Facebook Twitter