SME Times is powered by   
Search News
Just in:   • Corporate lending grows at fastest pace in Q1: BOK  • Adani Ports secures 10-year marine services for Argentina's 1st LNG export to India  • Indian auto industry sees best-ever May retail sales at over 25.3 lakh units  • Sensex, Nifty open 1 pc lower amid West Asia tensions, weak global cues  • India, Venezuela discuss deeper energy ties amid crude supply concerns 
Last updated: 27 Sep, 2014  

Congress Party symbol THMB PM ready for reply on coal blocks: Congress

coal mining
   Top Stories
» Sensex, Nifty open 1 pc lower amid West Asia tensions, weak global cues
» India clocks robust 7.7 pc GDP growth in 2025-26, Q4 growth at 7.8 pc
» RBI keeps repo rate unchanged at 5.25 pc, maintains ‘Neutral’ stance
» Crude oil prices fall over 1 pc as ceasefire hopes ease West Asia concerns
» Forced labour import curbs: US proposes up to 12.5 pc tariff on 60 countries, including India
SME Times News Bureau | 23 Aug, 2012
With the Bharatiya Janata Party (BJP) insisting on his resignation over faulty coal blocks allocation, Prime Minister Manmohan Singh is ready to make a strong rebuttal of the charges, Congress sources said Wednesday.

They said the prime minister would seek to turn the tables on the opposition in his statement by pointing out that state governments of non-United Progressive Alliance constituents had given in writing that there should not be an auction of the coal blocks.

"The prime minister is ready with a reply," a party leader said.

There was a feeling in the Congress that the BJP was deliberately stalling parliament so as to prevent the prime minister from speak on the issue.

The Congress has already rejected the BJP demand for the prime minister's resignation.

The house was adjourned for the second successive day Wednesday over Comptroller and Auditor General report on coal blocks allocation.

Congress sources said the prime minister was likely to point out in his statement that the assessment of a loss of Rs.1.85 lakh crore by the CAG in the coal blocks allocation was misleading.

They said that governments of Chhattisgarh, Odisha and Jharkhand and Rajasthan (under the rule of the BJP and it allies) and West Bengal (during the Left Front rule) had given in writing that there should not be an auction of the coal blocks.

Referring to the 2006-09 period when the coal portfolio was with the prime minister, Congress sources said that the CAG report had mentioned about 57 blocks but production had started in only one of them.

They said that the prime minister was also expected to negate the CAG contention that there was a delay about the law concerning auctions.

The sources said the prime minister was likely to point out that even normal legislative enactment took time because of inter-ministerial consultations and the framing of detailed guidelines.
 
Print the Page Add to Favorite
 
Share this on :
 

Please comment on this story:
 
Subject :
Message:
(Maximum 1500 characters)  Characters left 1500
Your name:
 

 
  Customs Exchange Rates
Currency Import Export
US Dollar
₹94.2
₹92.5
UK Pound
₹128.85
₹124.8
Euro
₹112.2
₹108.45
Japanese Yen ₹59.85 ₹58
As on 06 May, 2026
  Daily Poll
What is the biggest war impact on MSMEs?
 Export Disruption
 Raw Material Spike
 Freight Cost Surge
 Payment Delays
 Currency Volatility
 All
  Commented Stories
 
 
About Us  |   Advertise with Us  
  Useful Links  |   Terms and Conditions  |   Disclaimer  |   Contact Us  
Follow Us : Facebook Twitter