SME Times is powered by   
Search News
Just in:   • Corporate lending grows at fastest pace in Q1: BOK  • Adani Ports secures 10-year marine services for Argentina's 1st LNG export to India  • Indian auto industry sees best-ever May retail sales at over 25.3 lakh units  • Sensex, Nifty open 1 pc lower amid West Asia tensions, weak global cues  • India, Venezuela discuss deeper energy ties amid crude supply concerns 
Last updated: 29 Jul, 2024  

GVK.9.Thmb.jpg GVK Energy to set up two thermal power plants in Andhra

GVK.9.jpg
   Top Stories
» Sensex, Nifty open 1 pc lower amid West Asia tensions, weak global cues
» India clocks robust 7.7 pc GDP growth in 2025-26, Q4 growth at 7.8 pc
» RBI keeps repo rate unchanged at 5.25 pc, maintains ‘Neutral’ stance
» Crude oil prices fall over 1 pc as ceasefire hopes ease West Asia concerns
» Forced labour import curbs: US proposes up to 12.5 pc tariff on 60 countries, including India
SME Times News Bureau | 14 Jan, 2012
GVK Energy Ltd, a subsidiary of GVK Power & Infrastructure Limited, will invest Rs.40,000 crore to produce 6,400 MW of electricity in Andhra Pradesh.

The firm Friday signed four memorandums of understanding (MoUs) with the state government for four projects during the Partnership Summit 2012.

It will set up two coal-based power projects of 2,640 MW each and will add capacity to the two existing gas-based projects.

The super critical thermal power projects (4x660), will come up in coastal Andhra with an investment of Rs.16,000 crore each. While one project will be Indian coal based, the other will use imported coal.

Asked if the company would be importing coal from Australia, GVK power managing director Ram Bhupal told reporters here that the company was looking at different options.

The company will finalise the locations near the existing or proposed ports after a feasibility study, he added.

The company will sell entire power to be produced from one plant to state-owned power distribution companies. From the second plant, part of the power would be sold to distribution companies and part of it will be on merchant basis.

Both the projects will be financed in the debt equity ratio of 4:1 and the first phase of both is expected to be commissioned in 2017-18.

The company also signed agreements to increase the capacity of its gas-based power projects at Jegurupadu and Samarlakota, both situated in coastal Andhra district of East Godavari.

"We are confident that the gas will be made available for the expansion," said Bhupal.

 
Print the Page
Add to Favorite
 
Share this on :
 

Please comment on this story:
 
Subject :
Message:
(Maximum 1500 characters)  Characters left 1500
Your name:
 

 
  Customs Exchange Rates
Currency Import Export
US Dollar
₹94.2
₹92.5
UK Pound
₹128.85
₹124.8
Euro
₹112.2
₹108.45
Japanese Yen ₹59.85 ₹58
As on 06 May, 2026
  Daily Poll
What is the biggest war impact on MSMEs?
 Export Disruption
 Raw Material Spike
 Freight Cost Surge
 Payment Delays
 Currency Volatility
 All
  Commented Stories
 
 
About Us  |   Advertise with Us  
  Useful Links  |   Terms and Conditions  |   Disclaimer  |   Contact Us  
Follow Us : Facebook Twitter